OpenStreetMap logo OpenStreetMap

InfiNorth's Notes

Notes submitted or commented on by InfiNorth

Id Creator Description Created at Last changed
4297959 smithkm

https://www.saanich.ca/assets/Local~Government/Documents/Engineering/Cycling-%20Network.pdf Shows this as a cycle path

5276455 DENelson83

Multiple businesses in this building. Ground survey recommended.

5169422 InfiNorth

New Perimeter Trail Segment (seen here: https://metrovancouver.org/services/regional-parks/Documents/campbell-valley-regional-park-map.pdf) from 16th to 8th Avenue needs to be mapped as an MUP.

5199976 InfiNorth

Full marked and RRFB signalized Crossing under construction - Will require survey in next two months along with rest of Cook Street for protected bike lanes.

5285705 InfiNorth

New signage is conflicting - heading East on Haultain, you first encounter a sign directing you onto Florence as a bike route, and Florence has other signs indicating it as a bike route. However, official wayfinding sign eastbound at Epworth directs cyclists onto Epworth instead. I am seeking clarification from Oak Bay Engineering before removing one as a designated bike route.

4924364 InfiNorth

Campground needs more accurate mapping.

5187074 InfiNorth

There are no protected bike lane at this intersection. Removed from map but will need a new survey when construction complete.

Survey date: March 1st, 2026

4663548 InfiNorth

Do flexposts conform to OSM's definition of cycletrack?

5090508 InfiNorth

Needs some ongoing surveys for the protected bike lane projects.

4663538 InfiNorth

OpenStreetMap Wiki shows that this should be just part of Harbour Road rather than mapped separately, and tagged as followed:

cycleway:left=track
cycleway:right=no
cycleway:left:oneway=no

cycleway:right:oneway=*

This seems to be a consistent problem throughout the entire CRD.