InfiNorth's Notes

Notes submitted or commented on by InfiNorth

Id Creator Description Created at Last changed
Resolved 4695051 InfiNorth

132 St has protected bike lanes. Currently mapped as "standard lane," should be "bike track" in segments that are protected.

Resolved 5285705 InfiNorth

New signage is conflicting - heading East on Haultain, you first encounter a sign directing you onto Florence as a bike route, and Florence has other signs indicating it as a bike route. However, official wayfinding sign eastbound at Epworth directs cyclists onto Epworth instead. I am seeking clarification from Oak Bay Engineering before removing one as a designated bike route.

Unresolved 4986167

A ton of roadwork here needs to be surveyed in the next few months as projects wrap up (bike lanes).

Unresolved 5356925 InfiNorth

Boundary of Tribune Bay Park has changed.

https://governmentofbc.maps.arcgis.com/apps/instant/basic/index.html?appid=4b3eb47c25ff45fa9f6bff45e3f2a389&center=-124.639173,49.528235&level=14

Resolved 5305367 InfiNorth

New MUP is almost finished, connecting (annoyingly) to a pedestrian only crossing..

Resolved 4322638 smithkm

Tagging Bastion Square as one big pedestrian area obscures the presence of many stairs and ramps connecting different parts of the square.

Resolved 4734258 InfiNorth

Multi-use path needs continuation to Green Bay Road based on onsite survey rather than imagery as imagery is not up to date. Please ensure that "bike lane mapped separately" is tagged in the cycleway for Boucherie Road. Confirmation of cycleway layout and configuration up to Ogden Road also needed.

Unresolved 5314896 InfiNorth

District of Oak Bay's designated bike route plan for route 4.4a (central Oak Bay bikeway) is being relocated to Devon Road. This connector is not designated or designed for bikes.

Resolved 5309368 ShantiDam

"Moka House ( Coffee shop ) "
OSM snapshot date: 2024-06-13T18:38:33Z
POI has no name
POI types: building-address
#organicmaps ios 2026.05.12-1-ios

Unresolved 5308191 InfiNorth

Intersection is being redesigned and rebuilt somewhat during the Estevan/Haultain bikeway project. RRFBs have been removed but will be reinstalled.

https://www.oakbay.ca/building-infrastructure/active-transportation/henderson-and-haultain-estevan-bikeways/