gmar5's Notes

Notes submitted or commented on by gmar5

Id Creator Description Created at Last changed
Unresolved 5442163 4004

should this be trunk instead of trunk link? Ring road traffic (which is presumably the majority) would take the roundabout bypass

Resolved 4806279 Andrew Chadwick

This junction has traffic islands both sides on St Aldates, and preceding the turn into Thames St from N-bound St Aldates.

The road ways need splitting, particularly for the North-to-South St Aldates direction, which is really a straight-through.

It's a lot of work to redo route and turn-restriction relations though, and we should at least wait till the crossings and sidewalks are complete.

Unresolved 5256657 gmar5

Ongoing redevelopment here? This whole building shape needs some work.

Resolved 5215997 gmar5

Footpath temporarily closed for construction work at the nursery.

Resolved 5351539

Footpath runs straight and joins bridle way. There is no public right of way on this section of road

Resolved 4559032

New housing estate of bisby close, built off of halls close

Resolved 4458297 DorneyLake123

farm shop could be separated from the landuse here

Resolved 1991079

Omitted feature WW2 pill box https://photos.app.goo.gl/Dezkb437Xf5RnZmE6

Unresolved 5418503 gmar5

Work for the construction of the new Oxpens Bridge will begin in August 2026.

https://www.oxford.gov.uk/building-projects/oxpens-river-bridge

1. Bridge approximately where this note is.
2. The footpaths in Oxpens Meadow, and the two asphalted cycleways in Grandpont Nature Park will close. Diversion along this path: way/3343697
3. Expected completion Spring-Summer 2026.

Unresolved 5418531 gmar5

This field way/309706914 has been approved to become the Oxford Burial Meadow.
https://www.oxford.gov.uk/building-projects/oxford-burial-meadow