OpenStreetMap logo OpenStreetMap

eerib's Notes

Notes submitted or commented on by eerib

Id Creator Description Created at Last changed
5271683 eerib

High probability that the "Old Big Jump Line" trail mapped here is a fake trail. Requires ground survey to confirm.

5271681 eerib

High probability that the "Loamsome" trail mapped here is a fake trail. Requires ground survey to verify.

5010950 eerib

There is a rock climbing crag called Anthropocene Wall somewhere in this area. Requires a site survey to determine the correct cliff.

https://quickdrawpublications.com/wp-content/uploads/topos/Paradise_Anthropocene.pdf

4838414 eerib

Possible trail or rock climbing crag being developed here starting around the North end of the powerline road embankment. Investigate further.

4983691 eerib

New trail being constructed here to survey in ~November 2025.

https://imgur.com/a/6uWkeCk

5121456 eerib

Multi-year trail closures starting this later this month. Need to switch trails to access=no once the closure starts.

https://imgur.com/a/FSUEG1K

"Starting early January 2026, sections of Riverside Walk, Dyke Loop Trail, and Island Tip Trail will be closed. Sand Dune Trail and the western tip of Deas Island will be fully closed. These closures will remain in place until completion of the tunnel project in 2030."

https://metrovancouver.org/services/regional-parks/park/deas-island-regional-park

5164192 eerib

Rice Burger permanently closing on February 18th 2026 according to a post on their Instagram account.

https://www.instagram.com/p/DUjFhiPgZu9/

Change to a vacant shop after the 18th.

5078132

Department of Fisheries & Oceans - Langley Office
5550 268 Street

please confirm in-person if DFO has a office here or not

5166596 eerib

Portions of the Hastings Creek Trail are permanently closed. A survey is needed to accurately determine the closure points.

https://www.dnv.org/parks-trails-recreation/hastings-creek-trail

5122382 eerib

Construction works started here for the realignment of the Mountain Path.

Need to do ground survey to verify construction area, trail closures, and trail re-routes.