OpenStreetMap logo OpenStreetMap

dgryski's Notes

Notes submitted or commented on by dgryski

Id Creator Description Created at Last changed
5276679 dgryski

This sidewalk (heading down to the tracks) is now a MUP, and the sidewalk on E Columbia is under construction to also become a MUP connecting to the CVG on the other side of Columbia.

5357038 dgryski

Pretty sure this end of the park is now a double-wide-sidewalk-with-brick-divider (meaning Burnaby bike path). IIRC it also curves up Silver for a bit.

5357030 dgryski

There is now a bike path on this block.

5356869 dgryski

This is one-way (out of the parking lot.)

5356865 dgryski

This parking lot entrance is one-way *in* for cars.

5356856 dgryski

I think there's a drinking fountain on this wall.

5356854 dgryski

I think there's a drinking fountain by these showers.

5326988 dgryski

I think there's a little free library here

5339060 dgryski

Construction is finished.

5276457 AWhetter

Intersection needs updating for the construction project that is underway: https://vancouver.ca/files/cov/ontario-greenway-upgrades-info-sheet.pdf

Ontario street is currently closed between Walter Hardwick Avenue to the alleyway south of 1st Ave, and it expected to be until the fall (https://vancouver.ca/streets-transportation/ontario.aspx). The sections of W 1st and E 1st currently marked as under construction remain so.