dgryski's Notes
Notes submitted or commented on by dgryski
| Id | Creator | Description | Created at | Last changed | |
|---|---|---|---|---|---|
| 5276679 | dgryski | This sidewalk (heading down to the tracks) is now a MUP, and the sidewalk on E Columbia is under construction to also become a MUP connecting to the CVG on the other side of Columbia. |
|||
| 5357038 | dgryski | Pretty sure this end of the park is now a double-wide-sidewalk-with-brick-divider (meaning Burnaby bike path). IIRC it also curves up Silver for a bit. |
|||
| 5357030 | dgryski | There is now a bike path on this block. |
|||
| 5356869 | dgryski | This is one-way (out of the parking lot.) |
|||
| 5356865 | dgryski | This parking lot entrance is one-way *in* for cars. |
|||
| 5356856 | dgryski | I think there's a drinking fountain on this wall. |
|||
| 5356854 | dgryski | I think there's a drinking fountain by these showers. |
|||
| 5326988 | dgryski | I think there's a little free library here |
|||
| 5339060 | dgryski | Construction is finished. |
|||
| 5276457 | AWhetter | Intersection needs updating for the construction project that is underway: https://vancouver.ca/files/cov/ontario-greenway-upgrades-info-sheet.pdf Ontario street is currently closed between Walter Hardwick Avenue to the alleyway south of 1st Ave, and it expected to be until the fall (https://vancouver.ca/streets-transportation/ontario.aspx). The sections of W 1st and E 1st currently marked as under construction remain so. |