| 3816838 | moses4690226 | This only have single lane traffic via StreetComplete 53.3 Attached photo(s):
|
|||
| 4863464 | absentwalrus | This bike lane continues up Ruggles Street |
|||
| 4056041 | AntiCompositeNumber | Is this a MassDOT lot? It's not listed at https://www.mass.gov/park-and-ride. Verify parking operator. |
|||
| 4656213 | temportalflux | Ongoing construction on and next to River St from Green St to Mass Ave. Limited impact on roads, but sidewalks are often closed/moved. Likely to continue for many months of 2025. |
|||
| 5051733 | Ripe_Berries | There needs to be a connection here to allow bicycles to access the carlton street foot bridge from carlton st. The current infrastructure makes cyclists use 3 Carlton street's drive way. |
|||
| 4315927 | lmum | Separated bike paths will be added to Comm Ave carriageway in 2025 (Auburn St to Melrose). Adding a note here to ensure they are updated once complete |
|||
| 3134064 | cdevers | The Tobin School has been razed, and the area between Concord Avenue and Vassal Lane, bounded by Fresh Pond Parkway & the Massachusetts National Guard site to the west and the houses along Alpine St to the east, is now a giant construction site. This includes the area of the Father Callanan Playground. As of April 2022, the site has been more or less leveled and new construction hasn’t started yet. |
|||
| 4803495 | kilroywashere81 | What's going on here? Is there a gate in the sidewalk? |
|||
| 2636914 | colgza | Most of the light rail stops on the MBTA Green Line west of Copley station should be tagged with `railway=halt`. |
|||
| 3838944 | JesseFTW | Now under construction via StreetComplete 53.2 Attached photo(s):
|