OpenStreetMap logo OpenStreetMap

cubbe8's Notes

Notes submitted or commented on by cubbe8

Id Creator Description Created at Last changed
3816838 moses4690226

This only have single lane traffic

via StreetComplete 53.3

Attached photo(s):
https://westnordost.de/p/165811.jpg

4863464 absentwalrus

This bike lane continues up Ruggles Street

4056041 AntiCompositeNumber

Is this a MassDOT lot? It's not listed at https://www.mass.gov/park-and-ride. Verify parking operator.

4656213 temportalflux

Ongoing construction on and next to River St from Green St to Mass Ave. Limited impact on roads, but sidewalks are often closed/moved. Likely to continue for many months of 2025.

5051733 Ripe_Berries

There needs to be a connection here to allow bicycles to access the carlton street foot bridge from carlton st. The current infrastructure makes cyclists use 3 Carlton street's drive way.

4315927 lmum

Separated bike paths will be added to Comm Ave carriageway in 2025 (Auburn St to Melrose). Adding a note here to ensure they are updated once complete

https://www.newtonma.gov/government/planning/transportation-planning/projects/commonwealth-avenue-carriageway-redesign

3134064 cdevers

The Tobin School has been razed, and the area between Concord Avenue and Vassal Lane, bounded by Fresh Pond Parkway & the Massachusetts National Guard site to the west and the houses along Alpine St to the east, is now a giant construction site. This includes the area of the Father Callanan Playground. As of April 2022, the site has been more or less leveled and new construction hasn’t started yet.

4803495 kilroywashere81

What's going on here? Is there a gate in the sidewalk?

2636914 colgza

Most of the light rail stops on the MBTA Green Line west of Copley station should be tagged with `railway=halt`.

3838944 JesseFTW

Now under construction

via StreetComplete 53.2

Attached photo(s):
https://westnordost.de/p/168756.jpg