Resolved 792924 bentrails

Check if all points for Parramatta turnback project on map (commissioned late 2016).

Resolved 792921 bentrails

Arrival-Departure roads for AMF and MainTrain reconfigured late 2014. Some minor edits needed here.

Resolved 792920 bentrails

The points to and from the Up and Down Main lines here need to be removed. Decommissioned 2015.

Resolved 792918 bentrails

New points needed in this location. Commissioned 2014-2015.

Resolved 792908 bentrails

Works associated with southern sydney freight corridor complete. Needs fixing.

Resolved 792914 bentrails

New Up Relief track and North Strathfield underpass completed and commissioned in late 2015 (utilises the new platform at Concord West).

Resolved 792917 bentrails

New Up Relief track and North Strathfield underpass completed and commissioned in late 2015. Goes under main north lines in this approx location, connects to Homebush Loop.

Resolved 904277 bentrails

New M4 westbound carriageway to be added.

Resolved 792911 bentrails

Epping to Thornleigh Third Track project completed and commissioned in 2016.

Resolved 792904 bentrails

The 2 sections of 'under construction' track in this area are complete and in operation. There are also some points missing on the south side of Glenfield station to/from the Leppington overpass. There is probably some minor reconfig work needed at north side of Glenfield also.