1. Add bike and pedestrian infrastructure along 100th Ave NE that was completed in December 2025. The geometry likely needs refinement once aerial imagery is available. Also consider separating the foot and bike paths at that point in time.

    Closed
    #179380814 87 67 2 0
  2. Additions to Helene Madison Pool and fix ups around surrounding area

    Closed
    #179288885 21 32 2 0
  3. Align Greenwood Ave N with surrounding geometry. Update turn restrictions due to newly installed traffic controls.

    Closed
    #177742895 11 49 3 0
  4. Updated construction of Lake City Floodplain Park

    Closed
    #174211888 0 1 0 0
  5. Add bridge areas for I-5 that span Weedin Pl NE, NE 65th St, and NE Ravenna Blvd.

    Closed
    #174163978 64 18 0 0
  6. Street and pedestrian geometry and tagging improvements along 40th Ave NE between Sand Point Way NE and NE 55th St. Added some landuse as well.

    Closed
    #172627002 91 143 15 0
  7. Update Winslow Pl N to be a residential street rather than an alley. Although an alley continues north, Seattle Department of Transportation does not appear to consider Winslow Pl N to be an alley.

    Closed
    #172457713 23 80 0 0
  8. Large update to the channelization and restrictions at the intersection of N 38th St, Linden Ave N, and Fremont Way N. Also updates to pedestrian, parking, and speed limit tagging.

    Closed
    #172453120 74 66 16 0
  9. Update roads in North Seattle tagged as service=alley that had maxspeed tags conflicting with local law (i.e., not "15 mph").

    Closed
    #172415939 9 29 3 0
  10. Updates at NE 124th Intersection w/ Eastrail/Redmond Central Connector. Add start_date tags to new trail segment and remove TIGER tags.

    Closed
    #171848569 21 27 6 0
  11. Improve pedestrian features near Viewlands Elementary School

    Closed
    #170458937 8 37 0 0
  12. Fixing up overly broad landuse=industrial area covering the stadiums and other nearby non-industrial buildings.

    Closed
    #170179760 137 37 22 0
  13. Removed leftover construction tag from shared use path along WSDOT WOSCA property. Path appears to be open according to Seattle DOT.

    Closed
    #169686522 0 9 0 0
  14. Fixed Bitter Lake node's Wikidata and Wikipedia references.

    Closed
    #169683450 0 1 0 0
  15. Update 520 construction areas: the Montlake Project is officially complete and construction has shifted to the Portage Bay Bridge area.

    Closed
    #169490254 1 4 57 0
  16. Fix gap between Pier 58 and Pier 57, add additional walk paths on Pier 58.

    Closed
    #169489385 12 11 1 0
  17. Add basic Pier 58 shape and info, it opened today.

    Closed
    #169487078 29 14 29 0
  18. Add remaining landuse in Monroe, WA west of S Lewis St

    Closed
    #169122162 61 6 0 0
  19. Update landuse along Roosevelt Way NE between NE 86th St and NE 89th St

    Closed
    #168369405 88 79 35 0
  20. Update landuse for block bounded by NE 85th St, 8th Ave NE, NE 86th St, & Roosevelt Way NE.

    Closed
    #168363582 21 153 0 0