Natfoot's Notes
Notes submitted or commented on by Natfoot
| Id | Creator | Description | Created at | Last changed | |
|---|---|---|---|---|---|
| 5169656 | Linus W Frische | Disse railway=abandoned bør slettes og tilføjes til OpenHistoricalMap i stedet. Der findes ikke spor af jernbanen på stedet så de opfylder ikek kriterierne for railway=abandoned og bør ikke være i OSM. |
|||
| 5173814 | angys | ||||
| 5177576 | Nancy Devine | Unable to answer "Is this foot path completed?" – Road Under Construction – way/1061606874 via StreetComplete 62.2: This has been re-routed along the service road. |
|||
| 4905324 | Local media says 2 of the rail trestles were destroyed by the wildfire and also reported the third rail trestle is "compromised". |
||||
| 2496897 | Tpr Jeff | Split Rail Drive |
|||
| 5128260 | Tanner-Hiller Airport is permanently closed as of late 2024. The land is becoming the Menameset Habitat and the runway is being converted into the Mass Central Rail Trail. Please remove the active airport designation. See https://en.wikipedia.org/wiki/Tanner%E2%80%93Hiller_Airport for more information. |
||||
| 4719202 | bedouin_88 | O&W rail trail parking was added in 2024 as part of paving of the trail. The map needs to be updated to show this. |
|||
| 3711795 | IIVQ | A new rail terminal is being built here |
|||
| 4774022 | Parzival Wolfram | There's inactive rail tracks up to these ruins. via StreetComplete_ee 61.0 Attached photo(s):
|
|||
| 1980973 | rjgambrel | North of here Empire Builder and Staples Subdivision tracks seem to be correct. South of here work needs to be done to make sure things are right. For the most part the biggest problem seems to be the west most rail bed. |