OpenStreetMap logo OpenStreetMap

LokNeko's Notes

Notes submitted or commented on by LokNeko

Id Creator Description Created at Last changed
5138386

All the powerlines were changed to underground. Please remove the powerlines and power towers.

5039468 jackyzfy

Zhuhai Marine Center
自然资源部珠海海洋中心

4795164 Skylark_H_C

Wrong junction

4950101 Obanazawa Kuri

0230071

#OsmAnd

4783009 j333-1145

Unable to answer "What’s the surface here?" – Cycle Path – way/539224770 via StreetComplete 61.0:

这路既有砖路,也有橡胶跑道

This road has both brick paths and rubber tracks

Attached photo(s):
https://streetcomplete.app/p/281463.jpg

4782975 j333-1145

Unable to answer "What’s the surface here?" – Foot Path – way/1281915588 via StreetComplete 61.0:

这里是橡胶跑道,但选项里没有橡胶跑道

This is a rubber track, but there is no rubber track option in the selections.

Attached photo(s):
https://streetcomplete.app/p/281451.jpg

4950103 Obanazawa Kuri

此处过水路面不属实

#OsmAnd

4950100 Obanazawa Kuri

路牌显示该路段为G105,但道路等级为primary,请核查

#OsmAnd

4889726 Skylark_H_C

目前,我中心正加快推进金溪大道香洲段两个项目的前期工作,其中金溪大道工程(隧道及高架段),北起金溪大道高新段,采用隧道形式穿越凤凰山,在青松园附近设置互通立交,主线向南衔接金溪大道下穿金琴快线隧道工程,支线向西至三溪路交叉口,设计长度约7.13km,主线及支线均采用双向6车道;金溪大道下穿金琴快线隧道工程,北起金溪大道(隧道及高架段),采用隧道下穿金琴快线及广珠城际铁路,东至至现状健民路,设计长度约0.65km,主线采用双向4车道。
ref: https://www.zhuhai.gov.cn/sjb/zw/tz/content/post_3808314.html

4521656 Skylark_H_C

Haiyan Bridge now allow car to enter
Please change the lanes and roads in this intersection