A09's Notes
Notes submitted or commented on by A09
| Id | Creator | Description | Created at | Last changed | |
|---|---|---|---|---|---|
| 4513617 | A09 | Expect a new magistral road Ormož-Gorišnica-Markovci being constructed here till 2027. It crosses Sejanski potok, a bridge is already built there. Future road will also cross Formin canal. I have not yet seen any presentation of the road course. |
|||
| 4525454 | A09 | Ponikva Train Station is currently being renovated. Per governmental sources, we may expect new roofs on waiting platforms, a new underpass, new parking places, new train station infrastructure as well as some tweaks to the current railways. Renovation is not yet reflected on the current aerial imagery. |
|||
| 4509508 | A09 | Both bridges are already standing. Wait for the aerial imagery to update. Bridge is slightly offset to the currently drawn bridge here. Viaduct Jenina has some larger retaining walls to the southeast. Retaining walls were also constructed on southwest side of Visočnik Viaduct. Chapel of St. Joseph is still standing. Traffic portals were also installed on both bridges. On the northern end of Visočnik Vidauct large earthworks are taking place, presumably slip lanes will be constructed there. |
|||
| 4508836 | A09 | construction zone: new roundabout will be built here, new retaining walls as well as pedestrian and cycling infrastructure. new road lightning will be installed. construction zone is not yet visible on the current aerial imagery. due date: early december 2024 |
|||
| 4510435 | A09 | cycling path besides road Vrhnika-Horjul is finished and needs updated mapping. it seems like it runs alongside the main road in same level, and a fence was installed on the opposite side of the road. on some other parts, it's physically separated from the track. cycling path has two lanes. please wait for the aerial imagery update or make updates based on a GPS track. |
|||
| 4514826 | A09 | Some remodeling might be needed on this end of the bridge as it opens on Nov 11, 2024. So far, based on photos, that multiple retaining walls in terrace style were built on the eastern side of southern end of the bridge, as well as a retaining wall supporting road on the southwestern side of the bridge. |
|||
| 4508790 | A09 | 8 flats here somewhere in the future. based on visual observations, a service road on left and three middle sized houses will be built. |
|||
| 4454140 | A09 | Do not map area of this settlement. These are illegal buildings and are in process of being demolished |
|||
| 4510825 | A09 | by monday, november 11th, slip lane from Šentvid tunnel towards Ljubljana center will begin with construction. No signs of construction zone yet. Expect a survey in next week. Due date is autumn 2025. |
|||
| 4579747 | A09 | Some Italian bunkers are missing here. Will add them once I get their exact locations, types and shapes. |